Skip to main content
Audit Preparation

Halal Internal Audit Template: A Complete MHMS 2020 Checklist

28 March 20268 min readOleh TAQYID Editorial Team

Internal audits are your organisation's primary mechanism for detecting compliance gaps before JAKIM does. Under MHMS 2020, they are not optional — your Halal Assurance System (HAS) must include a structured internal audit programme with documented findings, NCRs, and corrective actions.

Yet many manufacturers treat internal audits as a formality — a checklist exercise completed before the external audit rather than a genuine compliance assessment tool. This guide provides an actionable internal audit template aligned to MHMS 2020 pillars that you can use as the basis for your audit programme.


Before You Audit: Planning Essentials

Who Should Audit?

Internal auditors must be:

  • Independent from the area they audit (a production line supervisor should not audit their own line)
  • Trained in internal audit techniques and MHMS 2020 requirements
  • Authorised by the JKHD (Jawatankuasa Halal Dalaman) to conduct audits

For smaller organisations, independence can be achieved by having staff audit departments other than their own. External audit support is acceptable where internal independence is not feasible.

How Often?

MHMS 2020 does not prescribe a fixed audit frequency, but best practice for most manufacturers is:

  • Comprehensive audit (full scope): at least once per year
  • Focused audits (high-risk areas like suppliers and HCPs): every 6 months
  • Ad-hoc audits: triggered by incidents, NCRs, process changes, or new product launches

Audit Scope

Each audit should define its scope — which MHMS pillars, which departments, which processes. A comprehensive annual audit covers all pillars. Focused audits target specific risk areas.


The Audit Checklist: Organised by MHMS 2020 Pillar

Use the following checklists during your internal audit. For each item, record: Compliant / Non-Compliant / Observation / Not Applicable, with evidence notes.

Pillar 1: JKHD (Internal Halal Committee)

#Audit ItemWhat to Check
1.1JKHD formally establishedAppointment letters, organisational chart
1.2Halal Executive meets MHMS qualificationsQualification documents, appointment letter
1.3JKHD membership documentedNames, roles, contact details current
1.4Meeting schedule followedMinutes for all scheduled meetings in audit period
1.5Minutes signed and filedSignatures, dates, action items recorded
1.6Action items from meetings tracked to closureEvidence of follow-through
1.7Halal policy signed and displayedCurrent version, visible in workplace

Pillar 2: HAS Documentation

#Audit ItemWhat to Check
2.1HAS manual current and version-controlledLatest version number, revision date, distribution list
2.2SOPs cover all halal-critical processesProcurement, production, storage, distribution, cleaning
2.3SOPs match actual practiceCompare documented procedures to observed operations
2.4Document register maintainedAll documents logged with version history
2.5Obsolete documents removed from circulationNo outdated SOPs accessible at workstations
2.6Records retrievable within reasonable timeTest: request a specific record and time the retrieval

Pillar 3: Halal Control Points (HCP)

#Audit ItemWhat to Check
3.1All HCPs identified and documentedHCP register complete for all production lines
3.2Monitoring procedures defined for each HCPClear instructions: what, how, when, who
3.3Monitoring records completeNo gaps in dates, signatures, or results for audit period
3.4Corrective actions defined for each HCPDocumented response procedures for deviations
3.5Deviations recorded and actionedEvidence that detected deviations triggered corrective action
3.6HCP register updated after process changesReview date current, reflects actual production setup

Pillar 4: Supplier and Raw Material Management

#Audit ItemWhat to Check
4.1Approved supplier list currentAll active suppliers listed, no unapproved suppliers in use
4.2Halal certificates validNo expired certificates; check every certificate on file
4.3Certificates from JAKIM-recognised bodiesVerify issuing body is recognised
4.4New supplier onboarding documentedProcedure followed, verification completed before first use
4.5Certificate expiry monitoring in placeSystem or schedule for tracking expiry dates
4.6Raw material register completeEvery ingredient cross-referenced to valid halal certificate
4.7Receiving inspection records maintainedCertificate check at every delivery documented

Pillar 5: Training

#Audit ItemWhat to Check
5.1Training programme documentedCovers all halal-sensitive roles with relevant content
5.2Training records completeAll staff in scope have documented training dates
5.3Refresher training scheduledSchedule exists and is followed
5.4New staff trained before assignmentEvidence of training before deployment at HCPs
5.5Halal Executive CPD currentOngoing professional development documented
5.6Staff at HCPs can demonstrate competencyInterview test: do they understand their halal responsibilities?

Pillar 6: Facility and Physical Controls

#Audit ItemWhat to Check
6.1Facility zoning matches documentationHalal/non-halal zones correctly demarcated
6.2Cleaning and sanitation records currentSertu procedures documented where required
6.3Equipment dedication or cleaning validationShared equipment protocols documented and followed
6.4Storage segregation verifiedHalal materials stored and labelled correctly
6.5Pest control halal-compliantMethods and chemicals verified, certificates available
6.6Signage appropriate and accurateHalal control areas marked and visible

Pillar 7: Previous NCR Closure

#Audit ItemWhat to Check
7.1All previous internal audit NCRs closedEvidence of corrective action and verification
7.2All previous JAKIM audit NCRs closedDocumented response submitted and accepted
7.3Root causes addressed (not just symptoms)Preventive actions in place, effectiveness verified
7.4No recurring NCRsSame finding not repeated from previous audit cycle

How to Document Findings

For each non-conformity found, document:

  1. Reference: pillar and checklist item number (e.g., "4.2 — Supplier certificates")
  2. Finding: factual description of what was observed
  3. Evidence: what you saw, measured, or could not locate
  4. Classification: Major NCR / Minor NCR / Observation
  5. MHMS reference: which MHMS 2020 requirement is not met

NCR Grading Guide

GradeCriteria
Major NCRA systemic failure or direct risk to halal integrity. Requires immediate corrective action.
Minor NCRAn isolated lapse that does not directly compromise halal integrity. Corrective action required within defined timeframe.
ObservationAn area of concern or improvement opportunity. No corrective action required, but should be monitored.

For detailed guidance on managing NCRs from this point forward, see our NCR management guide.


Sample Audit Report Structure

HALAL INTERNAL AUDIT REPORT

Audit Reference: [IA-2026-001]
Date: [dd/mm/yyyy]
Scope: [Full / Focused — specify pillars and areas]
Auditor(s): [Names and roles]
Auditee Department(s): [Names]

EXECUTIVE SUMMARY
- Total findings: X
- Major NCRs: X
- Minor NCRs: X
- Observations: X
- Areas of good practice: [list]

DETAILED FINDINGS
[One section per finding with reference, description, evidence, classification]

RECOMMENDATIONS
[Prioritised list of actions]

SIGN-OFF
Auditor signature: ___________  Date: ___________
JKHD review:      ___________  Date: ___________

Common Internal Audit Mistakes

Auditing to confirm, not to find. If your internal audits never produce NCRs, they are not rigorous enough. JAKIM will notice — and find what your internal audits should have.

No follow-up on findings. Raising NCRs without tracking them to closure is worse than not auditing at all — it demonstrates awareness of problems without willingness to fix them. See our JAKIM audit checklist for what auditors expect.

Auditing documentation only. Checking that documents exist is not enough. Verify that documented procedures match actual practice by observing operations and interviewing staff.

Inconsistent schedule. Audits that are repeatedly postponed or cancelled signal that the organisation does not take compliance seriously. Maintain your schedule.


Conclusion

A well-executed internal audit programme is the most powerful tool your organisation has for maintaining MHMS 2020 compliance between JAKIM inspections. This template provides the structure — but the value comes from rigorous, honest execution and genuine follow-through on findings.

TAQYID's audit management module provides structured MHMS-aligned checklists, automated scheduling, integrated NCR workflows, and audit reporting — making internal audits a sustainable practice rather than a periodic scramble.

Explore TAQYID's audit management →

internal audithalal audit templateMHMS 2020JAKIMchecklistHAS

Continue Reading

Bersedia untuk memperkemas pematuhan MHMS 2020 anda?

Sertai pengilang yang sudah mengurus pensijilan halal mereka dengan yakin. Akses awal percuma — 50 syarikat pertama.

Dapatkan Akses Percuma ke TAQYID